Chemical Engineering > GATE 2015 > Control Systems
The block diagram for a process with feedback control for output deviation variable h is shown in the figure below. All transfer functions are given with pre-factor of s in minutes. A unit step change is made in the set-point at t=0. The time required for h to reach 50% of its ultimate value, in minutes (up to two decimal places), is: _______

Correct : 0.88

Similar Questions

The transfer function for the disturbance response in an open-loop process is given by Gdopen(s). The corresponding transfer function for the disturbance respon...
#489 MCQ
A first-order process having a transfer function, GP = 2/7s + 1 is controlled by a proportional controller with gain of 3.2. The process time constant is in...
#545 MCQ
For a closed-loop system, consider the following transfer functions: process Gp(s) = 2 / (7s +1) ; controller Gc(s) = 2 ; Gm(s) =1 ; Gf(s)=1 The offset in the...
#572 Fill in the Blanks

Related Topics

feedback control system process control chemical engineering gate 2015 unit step response time constant calculation GATE chemical engineering 2015 control systems time to reach 50% chemical engineering questions

Unique Visitor Count

Total Unique Visitors

Loading......