Chemical Engineering > GATE 2014 > Drying
A wet solid of 100 kg is dried from a moisture content of 40 wt% to 10 wt%. The critical moisture content is 15 wt% and the equilibrium moisture content is negligible. All moisture contents are on dry basis. The falling rate is considered to be linear. It takes 5 hours to dry the material in the constant rate period. The duration (in hours) of the falling rate period is

Correct : 1.2

Similar Questions

Alumina particles with an initial moisture content of 5 kg per kg dry solid are dried in a batch dryer. For the first two hours, the measured drying rate is co...
#63 MCQ
Wet air containing 10 mole percent water vapor is dried by continuously passing it through a column of CaCl2 pellets. The pellets remove 50 percent of water f...
#143 Fill in the Blanks
A wet solid containing 20% (w/w) moisture (based on mass of bone-dry solid) is dried in a tray-dryer. The critical moisture content of the solid is 10% (w/w). T...
#191 Fill in the Blanks

Related Topics