Chemical Engineering > GATE 2012 > Probability
An automobile plant contracted to buy shock absorbers from two suppliers X and Y. X supplies 60% and Y supplies 40% of the shock absorbers. All shock absorbers are subjected to a quality test. The ones that pass the quality test are considered reliable. Of X's shock absorbers, 96% are reliable. Of Y's shock absorbers, 72% are reliable. The probability that a randomly chosen shock absorber, which is found to be reliable, is made by Y is
A
0.288
B
0.334
C
0.667
D
0.720

Correct : b

Similar Questions

Consider the normal probability distribution function f(x) = 4 / √(2π) e−8(x+3)2 If μ and σ are the mean and standard deviation of f(x) respectively, th...
#32 MCQ
An exhibition was held in a hall on 15 August 2022 between 3 PM and 4 PM during which any person was allowed to enter only once. Visitors who entered before...
#130 MCQ
A game consists of spinning an arrow around a stationary disk as shown below. When the arrow comes to rest, there are eight equally likely outcomes. It could...
#165 MCQ

Related Topics

No tags found

Unique Visitor Count

Total Unique Visitors

Loading......