Chemical Engineering > GATE 2012 > Probability
An automobile plant contracted to buy shock absorbers from two suppliers X and Y. X supplies 60% and Y supplies 40% of the shock absorbers. All shock absorbers are subjected to a quality test. The ones that pass the quality test are considered reliable. Of X's shock absorbers, 96% are reliable. Of Y's shock absorbers, 72% are reliable. The probability that a randomly chosen shock absorber, which is found to be reliable, is made by Y is
Correct : b
Similar Questions
Consider the normal probability distribution function
f(x) = 4 / √(2π) e−8(x+3)2
If μ and σ are the mean and standard deviation of f(x) respectively, th...
An exhibition was held in a hall on 15 August 2022 between 3 PM and 4 PM during
which any person was allowed to enter only once. Visitors who entered before...
A game consists of spinning an arrow around a stationary disk as shown below.
When the arrow comes to rest, there are eight equally likely outcomes. It could...
Total Unique Visitors
Loading......